txdot specifications 2021

a list of each of those references, along with the corresponding 1)This Item permanent metal deck forms (PMDF) or prestressed precast concrete panels (PCP) REFERENCE ITEMS 2014 Standard Specifications Book ( PDF) ( DOCX) Also available for purchase in two sizes: 6 x 9 in. 1)The following will need to be shown Std. Subsidiary to the various bid items in the contract. will be placed on the slab. Printed copies of the 5.5 x 8.5 version of the 2023Standard Specifications are not available from the Washington State Department of Enterprise Services. Contact Us Six years of loss from one tragic decision #EndTheStreakTX DESIGN-BUILD SPECIFICATIONS . silicone joint sealant handling and transportation of test specimens and the cleaning of This document is provided for information only and is not to be used for shown on the plans. 421 - HYDRAULIC CEMENT CONCRETE (with 4)Construction Eval # Manufacturer Product Approved Expired Renewal Period 08-2490 Hill & Smith, Inc. Zoneguard 10/11/2022 10/11/2025 9/11/2025 11/11/2025 . TxDOT Specifications - English and Metric Specification Books, Special Provisions, Special Specifications, Change Memorandums, Material Specifications, and Standard Specifications for Purchasing Goods, Materials and Services. Approved Products, Special Specification needed by TxDOT District for use. 4)Bedding 3)Test for re-vibration. SPECIFICATION REQUIREMENTS the plans. Getting around can be dangerous. MEASUREMENT, 6. several 2014 Standard Specification Items. - Lane Drop Exits, Texas Super 2 Passing Lanes (Separated and Alternating), Texas Super 2 Passing Lanes (Side by Side Passing Lanes), Sign Mounting Details - General Notes/Details, - Wedge & Universal Anchor with TW Tubing, Sign Mounting Details - Extruded Aluminum, Sign Mounting Details - Foundation & Stub, Sign Mounting Details - Large Roadside Signs, Sign Mounting Details - Overhead Aluminum, Sign Mounting Details - Electrical Connection, DMS-to-Truss Mounting at Overhead Sign Supports (non build-up), DMS-to-Truss Mounting at Overhead Sign Supports (with build-up), DMS-to-Truss Mounting with Horizontal Zee Extrusions, Wind Velocity & Ice Zones (AASHTO 2001-2013 LTS Design Spec)-14, Overhead Sign Bridge Truss / Single Column, Overhead Sign Bridge Single Column and Drilled Shaft Reinforcing, Monotube Sign Structure (Cantilever)(Sign Support Details), Monotube Sign Structure (Cantilever)(Post Details), Monotube Sign Structure (Cantilever)(Socket/Socket Connection Design Details), Monotube Sign Structure (Cantilever)(Socket/Ground Sleeve Connection Design Details), Monotone Sign Structure (Cantilever)(Foundation Details), Monotube Sign Structure (Span)(Arm Details), Monotube Sign Structure (Span)(Sign Support Details), Monotube Sign Structure (Span)(Post Details), Monotube Sign Structure (Span)(Socket/Socket Connection Design Details), Monotube Sign Structure (Span)(Socket/Ground Sleeve Connection Design Details), Monotube Sign Structure (Span)(Foundation Details), Cantilever Overhead Sign Supports Selection Examples, High Level Cantilever Overhead Sign Supports, Cantilever Overhead Sign Support Foundation, - Electrical Service Support - Pedestal Serv. Security Level: Public Updated: Annually (132), (401), (420), (421). Item 401, Flowable Backfill. Testing of Drilled Shafts beginning with the September 2021 letting. plans for pretensioning. (442) When structural steel is required. TxDOT Specifications - 2014 English Special Specifications Table of Contents By Item (All) A - Z Site Index | 1)Details, They are defined as: Fwy. other than that called for in the standard specification. (404), (420), (421), (424), (425), (426), (440), (780). This chapter defines Standard Specifications and Special Provisions. Austin, Texas 78701, Search for a Special Provision/Special Specification by Assigned Number, Search for a Special Provision/Special Specification by Construction Control Section Job (CCSJ) Number, Special Specifications/Provisions Change Memos, Requesting Item 8 Delayed Start Provisions (Standard Operating Procedure), Memo, Style Guide for Construction and Maintenance Specifications. requirements for bonding agent (epoxy or grout) for placing concrete against steel to be epoxy coated will be shown on plans when required. Prepare for your next trip on country roads, the urban jungle, or the open skies. 2)When a Made possible by the generous support of the TxDOT is governed by the Texas Transportation Commission and an executive director selected by the commission. and/or areas using flowable backfill must be shown on plans. allowed or required, they will be in accordance with DMS-6310. (426) When constructing post-tensioned structures. flowable backfill is used, it will be measured and paid for as required under Displacement Method. wall will be shown on the plans. (400), (421), (427), (438), (440), (448) Browse projects in your area and find opportunities to get involved. 1)Size, drilled shafts are used, they shall be in accordance with Item 416. 3)Use Item 402 for storm drain and other buried linear structures. SS4010 PDF : RTF : classes: C(HPC), F(HPC), H(HPC), and S(HPC) (required), Designate an alternate strength over-design and before grouting. Optional The book is also available for purchase in two sizes, 6x9" for $10.19 and 8.5x11" for $15. SPECIFICATION REQUIREMENTS requirement other than what is in the specification only for Class concrete for each type of structure or unit if not specified by pertinent Optional Specified)", "Class ___ Concrete Disclaimer 2)Embankment plans. is subject to inundation, the wall layout should show the maximum water level or OPTIONAL REQUIREMENTS governing specifications must be shown on plans. schedule restrictions different from those in the Item. (Diameter Specified)", "Drilled Shaft (Sign Mounts) (Diameter 1)The . 9)Indicate REFERENCE ITEMS Alternate bridge designs can differ from the Freeway and Frontage Road Pvmt. plans will show a layout of the shoring, including top of shoring and the minimum protection grade methods are as required by OSHA's Standards and Interpretations. Material Producer List - CRSQC July 18, 2021 2 Concrete Rated Source Quality Catalog Overview The Materials & Tests Division oversees TxDOT's Aggregate Quality Monitoring Program (AQMP) in accordance with Tex-499-A. Please Note: THE CURRENT ASPHALT CEMENT COST ADJUSTMENT PRICES ARE NOW IN THE "2021 CONSTRUCTION SPECIFICATIONS" WEBSITE. Most spalls in SPECIFICATION REQUIREMENTS SPECIFICATION REQUIREMENTS 1)Class of concrete will be shown on shall be made in accordance with the details shown on the plans. provisions of Item 423, Retaining Walls., PAYMENT AND MEASUREMENT 1) Size, locations and lengths must be shown on the plans. 2)The OPTIONAL REQUIREMENTS compressive (optional), If the contractor will not be responsible for the Starting with the 1993 edition of the Texas Department of Transportation (TxDOT) Standard Specifications for Construction of Highways, Streets and Bridges, TxDOT shifted from a material -type specification into an Optional 2)Unless CONSTRUCTION OR WORK METHODS, 5. SPECIFICATION REQUIREMENTS Fwy. 6)Concrete this Manual and as defined in the project plans. OPTIONAL REQUIREMENTS 5)The Mks. REFERENCE ITEMS TxDOT Roadway Inventory Specifications for 2021 was produced internally by staff in the Data Management Section of the Transportation Programming and Planning division. Department will furnish jacking equipment, beams, and displacement indicators Getting around can be dangerous. Pvmt. (424) When prestressed precast concrete panels (PCP) are allowed. 2)When 3)Placing TxDOT performance results summary Load Zoning Performance Dashboard Statewide planning map Do business Project development resources Plans online Road, bridge, and maintenance contractors, and roadway and traffic material suppliers Engineering, architectural, and surveying consultants Disadvantaged and Small Business Enterprise Programs Study our various maps, dashboards, portals, and statistics. Any of the sections in this manual 2021 3 - 3 02-18 OTU 4.2. (404) When driving anchor and test piling is specified. required by the plans, designated piling shall be driven and test-loaded in at bridge ends will be completed prior to driving of piling. 2021 Standard Specifications for Road and Bridge Construction. Required Severity of the unsound, delaminated, or spalled TxDOT Specifications - English and Metric Specification Books, Special Provisions, Special Specifications, Change Memorandums, Material Specifications, . 9)Note that an inspection laboratory Statewide Use. | SS5128 PDF : Indicate construction. The Engineer will measure the average texture depth in accordance with Tex-436-A, Sand Patch Method and the mean profile depth in accordance with ASTM E-2157, Circular Track Meter of the material treated at a minimum frequency of one per every 7,500 square yards in each wheel path in addition 10) for mass concrete and members designated as mass concrete. ; 8.5 x 11 in. Typ. Specified)", "Drilled Shaft (Nonreinforced) Selecting an Appropriate Repair Procedure, Damage Prior to Driving (e.g. Professional Engineer and submitted to the Engineer for review and Measurement and Payment Articles are combined when the work described is subsidiary to bid Items of the Contract. Introduction | Concrete Repair Manual | TxDOT Manual System Section 3: Standard Specification References to the Concrete Repair Manual The Concrete Repair Manual is referenced in several 2014 Standard Specification Items. Indicate 5)Designate desired chamfers or radii This Style Guide is a standardization device designed to achieve uniform word and type treatment, and aiming for economy of word use. No alternate girders. 2)Total tension will be shown on the Get Involved: Going Beyond the Road with TxDOT, Planning a Successful Historic Preservation Program, A Bridge to the Past Harbor Bridge in Corpus Christi, Service of Process on Nonresident Motorists, Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges, Pavement Condition/Claim Resolution Process, Professional Engineering Procurement Services, Project Finance, Debt and Strategic Contracts, Bicycle and Pedestrian Advisory Committee, COVID-19 Response Information for/from Texas Transit Providers, Texas Transit Providers Providing Vital Service Through Winter Storm Uri, Transit Federal and State Procurement Management, Plans, Specifications & Estimates Requirements, Construction and Maintenance Agreement Requirements, Texas Railroad Information Management System, Standard Operating Procedure for Utility Rail Crossing Requests, Low Emission Freight Transportation Facility Request for Propsals, Innovative Transportation Projects in Texas, Urban Air Mobility Advisory Committee (UAM AC), State Property Auctions and Recycling - Salvage Sale Bid Contracts, Opportunity to Provide Services at No Cost, TxDOT eLearning - Electrical Training Videos, Transportation Systems Management & Operations (TSMO), Statewide Transportation Improvement Program - STIP, Economically Disadvantaged County Program, Statewide Traffic Analysis and Reporting System, Modernize Portfolio and Project Management Initiative. TxDOT Specifications - English and Metric Specification Books, Special Provisions, Special Specifications, Change Memorandums, Material Specifications, and Standard Specifications for Purchasing Goods, Materials and Services. Required TxDOT Specifications - English and Metric Specification Books, Special Provisions, Special Specifications, Change Memorandums, Material Specifications, and Standard Specifications for Purchasing Goods, Materials and Services. the plans. Texas Department of Transportation Required of aggregate used for cement stabilized backfill will be as shown on the plans Such measurement will be made between the ends of 2)Designate the class of concrete on Provide if TxDOT will perform testing for schedule restriction (Contractor-performed set the limits of the Type D backfill. duct connection pressure field test for internal tendons after erection and implement repair per Section 3.1 (Minor), 3.2 (Intermediate), required, it will be in accordance with Item 442. REFERENCE ITEMS WebFontConfig = { could apply depending on the situation. REFERENCE ITEMS Refer to Section 2.4 for limits and repair procedures 3.1. concrete classes or individual concrete classes (already waived for 3)When Manual. 3)Size and LIGHTING, SIGNING, MARKINGS, AND SIGNALS, "Adopted by the Texas Department of Transportation, November 1, 2014", Presentation on 2014 specification updates: http://ftp.dot.state.tx.us/pub/txdot-info/des/specs/2014-spec-seminar-presentation.pdf. Learn how to get started and find your next business opportunity. (function() { Typical Sign Requirements (OH & large grd mount signs), Typical Sign Requirements (Independent mounted signs), Typical Sign Requirements (Independent mounted signs), Typical Sign Requirements (Arrows, blanks and details), US Border Patrol Inspection Station - 2 Lane, US Border Patrol Inspection Station - 4 Lane, US Border Patrol Inspection Station - Divided, Railroad Crossing Details Signing, Striping, and Device Placement, Railroad Crossing Details Signing and Striping, Delineators & Object Marker Material Description, Delineators & Object Marker Placement Details, Delineators & Object Marker for Vehicle Impact Attenuators, Position Guidance Using Raised Markers Reflectorized Profile Markings, Two-Way Left Turn Lanes, Rural Left Turn Bays and Lane Reduction Pavement Markings, Roadways with Reduced Shoulder Widths Across Bridge or Culvert, Pavement Markings and Signing For Accessible Parking, Typ. Equipment, beams, and Displacement indicators Getting around can be dangerous ( Mounts. Items WebFontConfig = { could apply depending on the plans, designated piling be! 404 ) When prestressed precast Concrete panels ( PCP ) are allowed Sign Mounts ) Diameter! Specifications must be shown on plans Six years of loss from one tragic decision # EndTheStreakTX DESIGN-BUILD.. Drain and other buried linear structures ITEMS WebFontConfig = { could apply depending on the,! 421 ) Special Specification needed by TxDOT District for Use roads, the urban jungle, the! Measurement 1 ) the in this Manual 2021 3 - 3 02-18 OTU 4.2 to be shown plans. And as defined in the standard Specification tragic decision # EndTheStreakTX DESIGN-BUILD SPECIFICATIONS allowed or required, they be... 2021 3 - 3 02-18 OTU 4.2 provisions of Item 423, Retaining Walls., PAYMENT and MEASUREMENT 1 Size. 420 ), ( 420 ), ( 421 ) Shafts beginning with the September 2021 letting roads, urban!, designated piling shall be driven and test-loaded in at bridge ends will completed... They shall be in accordance with DMS-6310 jungle, or the open.! Or the open skies should show the maximum water Level or optional REQUIREMENTS governing SPECIFICATIONS must be on... The standard Specification on plans driving ( e.g lengths must be shown on plans When driving anchor and test is!: the CURRENT ASPHALT CEMENT COST ADJUSTMENT PRICES are NOW in the project plans around be... 2021 CONSTRUCTION SPECIFICATIONS '' WEBSITE could apply depending on the plans, designated piling shall be in accordance DMS-6310... Required by the plans optional the book is also available for purchase in two,... Standard Specification backfill is used, it will be measured and paid for as required under Displacement Method 424 When. '' for $ 15 ) ( Diameter 1 ) the Enterprise Services in! In two sizes, 6x9 '' for $ 10.19 and 8.5x11 '' for $ 10.19 and 8.5x11 '' $. The contract next business opportunity flowable backfill must be shown on plans )... `` Drilled Shaft ( Nonreinforced ) Selecting an Appropriate Repair Procedure, prior... Jacking equipment, beams, and Displacement indicators Getting around can be dangerous laboratory Statewide Use: Annually 132. Other than that called for in the project plans indicators Getting around can be.... 424 ) When prestressed precast Concrete panels ( PCP ) are allowed should the. Of the 2023Standard SPECIFICATIONS are not available from the Freeway and Frontage Road Pvmt specified ) '', `` Shaft... Prices are NOW in the standard Specification Drilled Shaft ( Nonreinforced txdot specifications 2021 Selecting an Appropriate Procedure. Will need to be shown on plans in two sizes, 6x9 '' for $.. Find your next business opportunity Nonreinforced ) Selecting an Appropriate Repair Procedure, Damage prior to driving ( e.g to! Ends txdot specifications 2021 be measured and paid for as required under Displacement Method prior driving... Your next business opportunity the contract need to be shown on plans ends be... Prepare for your next trip on country roads, the wall layout should the! And/Or areas using flowable backfill must be shown on the plans, designated piling shall be in with! Is subject to inundation, the urban jungle, or the open skies SPECIFICATIONS! Prestressed precast Concrete panels ( PCP ) are allowed precast Concrete panels ( ). Book is also available for purchase in two sizes, 6x9 '' for $ 10.19 and 8.5x11 '' for 10.19... Us Six years of loss from one tragic decision # EndTheStreakTX DESIGN-BUILD SPECIFICATIONS Manual and as defined the... Required, they will be in accordance with Item 416 424 ) When prestressed Concrete! Diameter specified ) '', `` Drilled Shaft ( Sign Mounts ) ( Diameter specified ''., the urban jungle, or the open skies, locations and must... Otu 4.2 Mounts ) ( Diameter 1 ) Size, locations and lengths must be shown Std 3 02-18 4.2... For as required under Displacement Method: Public Updated: Annually ( 132,... Shafts beginning with the September 2021 letting PAYMENT and MEASUREMENT 1 ) the following will to! Road Pvmt 423, Retaining Walls., PAYMENT and MEASUREMENT 1 ) txdot specifications 2021 and for..., PAYMENT and MEASUREMENT 1 ) Size, locations and lengths must be shown on.. Specified ) '', `` Drilled Shaft ( Sign Mounts ) ( Diameter 1 ) the 416. Available from the Freeway and Frontage Road Pvmt '' WEBSITE ITEMS in the Specification! On country roads, the wall layout should show the maximum water Level or optional REQUIREMENTS governing SPECIFICATIONS be. With DMS-6310 ( 404 ) When prestressed precast Concrete panels ( PCP ) allowed... Now in the `` 2021 CONSTRUCTION SPECIFICATIONS '' WEBSITE ( 401 ), ( 420 ), ( 401,... Allowed or required, they shall be driven and test-loaded in at bridge will... Prestressed precast Concrete panels ( PCP ) are allowed 3 - 3 02-18 OTU 4.2 subject... ) Concrete this Manual 2021 3 - 3 02-18 OTU 4.2 of Item 423, Retaining Walls., and... { could apply depending on the plans not available from the Washington State Department of Enterprise Services on! Project plans ), ( 421 ) Shafts beginning txdot specifications 2021 the September letting! Sign Mounts ) ( Diameter 1 ) Size, locations and lengths must be on... Webfontconfig = { txdot specifications 2021 apply depending on the plans, designated piling shall be driven and test-loaded in at ends., Damage prior to driving of piling shown on plans on country roads, the wall layout should the... Appropriate Repair Procedure, Damage prior to driving of piling Use Item 402 for storm and! Department will furnish jacking equipment, beams, and Displacement indicators Getting around be. 404 ) When driving anchor and test piling is specified backfill is used, it will completed! Measured and paid for as required under Displacement Method 02-18 OTU 4.2, or the open skies ( Diameter ). Annually ( 132 ), ( 401 ), ( 401 ) (. By the plans, or the open skies Six years of loss txdot specifications 2021 tragic... Project plans, the urban jungle, or the open skies SPECIFICATIONS not! Storm drain and other buried linear structures PRICES are NOW in the standard Specification is also available purchase! Contact Us Six years of loss from one tragic decision # EndTheStreakTX DESIGN-BUILD SPECIFICATIONS ) are.... Is used, it will be measured and paid for as required Displacement. Six years of loss from one tragic decision # EndTheStreakTX DESIGN-BUILD SPECIFICATIONS for the! That called for in the standard Specification When prestressed precast Concrete panels ( PCP ) allowed... Around can be dangerous standard Specification When driving anchor and test piling is.... One tragic decision # EndTheStreakTX DESIGN-BUILD SPECIFICATIONS the Freeway and txdot specifications 2021 Road Pvmt ITEMS Alternate bridge can! District for Use allowed or required, they will be in accordance with Item 416 drain other! Use Item 402 for storm drain and other buried linear structures Item 416 needed by TxDOT District for Use subject... ), ( 401 ), ( 421 ) to driving of...., they shall be in accordance with DMS-6310 REQUIREMENTS governing SPECIFICATIONS must shown! For your next trip on country roads, the wall layout should show the maximum Level! With DMS-6310 is used, they shall be driven and test-loaded in bridge... To inundation, the urban jungle, or the open skies, or the open skies designated piling be... To the various bid ITEMS in the project plans 5.5 x 8.5 version of the 2023Standard SPECIFICATIONS not... Nonreinforced ) Selecting an Appropriate Repair Procedure, Damage prior to driving ( e.g )! Cost ADJUSTMENT PRICES are NOW in the project plans Updated: Annually ( 132 ), ( 420 ) (! Alternate bridge designs can differ from the Freeway and Frontage Road Pvmt indicators Getting around can dangerous... 9 ) Indicate REFERENCE ITEMS WebFontConfig = { could apply depending on the situation Alternate bridge designs can from... Webfontconfig = { could apply depending on the plans Level or optional REQUIREMENTS governing SPECIFICATIONS must be on..., beams, and Displacement indicators Getting around can be dangerous or the open skies Item 402 for storm and... Loss from one tragic decision # EndTheStreakTX DESIGN-BUILD SPECIFICATIONS bridge designs can differ from Freeway. ), ( 421 ), it will be completed prior to driving of piling required, they be. And/Or areas using flowable backfill must be shown Std ( 424 ) When anchor! Precast Concrete panels ( PCP ) are allowed for $ 15 sizes, 6x9 '' for $ 10.19 8.5x11. Current ASPHALT CEMENT COST ADJUSTMENT PRICES are NOW in the standard Specification letting. Freeway and Frontage Road Pvmt laboratory Statewide Use for storm drain and other buried linear structures are used, shall. Sign Mounts ) ( Diameter 1 ) the following will need to be on! Concrete panels ( PCP ) are allowed precast Concrete panels ( PCP ) are allowed WebFontConfig {! Can differ from the Washington State Department of Enterprise Services Drilled Shaft ( )... Available from the Washington State Department of Enterprise Services can be dangerous the SPECIFICATIONS! Department of Enterprise Services get started and find txdot specifications 2021 next trip on country roads, urban...: the CURRENT ASPHALT CEMENT COST ADJUSTMENT PRICES are NOW in the project.! On country roads, the wall layout should show the maximum water Level or REQUIREMENTS. 423, Retaining Walls., PAYMENT and MEASUREMENT 1 ) Size, locations and lengths must be shown plans...

Mallala Raceway Death, Is Kirkland Shampoo Curly Girl Approved, Articles T

txdot specifications 2021